Products and Specifications
Tanks for Foodstuffs
T11 IE 21 Glycol Heated Tank 21000 Litre
| Dimensions: | ||
| Metric | Imperial | |
| Capacity | 21000 LTR | 5548 US GALLONS |
| Maximum Gross Weight | 34000 KG | 74956 LBS |
| Tare | 3570 KG | 7870 LBS |
| Construction: | ||
| Working Pressure | 4.0 BAR | 58 PSI |
| Test Pressure | 6.0 BAR | 87 PSI |
| Steam Working Pressure | 4.0 BAR | 58 PSI |
| Steam Test Pressure | 6.0 BAR | 87 PSI |
| Relief Valve | 4.4 BAR | 63 PSI |
| Ambient temp. range | -40°C to +65°C | -40°F to +149°F |
| Maximum cargo temp | 130°C | 266°F |
| Standard Fittings: | ||
| Shell Material | Stainless steel, AISI 316 / DIN 1.4436 | |
| Thickness | 4.6 MM shell, 5.05 MM ends | |
| Design Code | ASME, section VIII, division 1 | |
| Approvals | Lloyd's Register Construction Certificate, DOT UK IMO type 1, DOT US IM101, UIC, CTC, AAR, FRA, CSC, ISO, ADR, RID | |
| Standard Fittings | ||
| Manlid | 500 MM (20") diameter. | |
| Calibration | Volumetric calibration chart. | |
| Airline | 40 MM (1½") s/s ball valve and screw cap (SCZU 873609 2" BSP butterfly valve). | |
| Relief Valve | 63 MM (2½") BSP | |
| Bottom Discharge | 75 MM (3") cleanflow foot valve and clamped 75 MM (3") butterfly valve. Outlet 3" BSP screw thread and cap. | |
| Compartments | Top and bottom fittings contained in insulated and lockable compartments. | |
| Gaskets & Seals | Parts in contact with cargo, PTFE/Teflon. | |
| Insulation | 100 MM (4") Isocyanurate; white 2 MM grp cladding; thermal value 16 Kcal/hrc. |
|
| Glycol Heating | Electric Heating system circulating warmed water though steam heating ducts - 5m² (53ft²) effective surface area external steam ducts. | |
| Valve Connections | Wide range of alternative outlets such as camloc quick release, 3A sanitary, RJT sanitary. | |
Actual measurements and specifications may vary and are subject to confirmation. The authorised Dangerous Goods Advisor should confirm fitness for purpose of any tank and that the cargo is compatible and will not attack the tank vessel. Tank containers are supplied in accordance with a signed lease and GE SeaCo General Trading conditions.









